Preparation before installation of roof hatch.

Update:Mar 18,2026
Summary:Preparation before installation of roof hatch Preparation before installation Confirmed location: it shall be set at the gathering place of pipelines......

Preparation before installation of roof hatch Preparation before installation Confirmed location:

it shall be set at the gathering place of pipelines, near equipment or at a location convenient for operation, so as to avoid corners or hidden hard-to-reach areas.

Determine the size: If personnel need to enter, it is recommended to reserve 600 mm× 600 mm; If it is only used for inspection or threading, it can be ‌400mm×400mm‌ or less.

Material selection: there are commonly finished gypsum manhole (integrated with ceiling) and aluminum alloy manhole (light and corrosion resistant).